Project Finance of the Turkana Wind Power Project Finance Essay
Introduction The project proposal was made in 2009 and is to be located in Kenya, at the southern end of Lake Turkana. The project has a concession area of about 150Km2 for 99 years renewable every 33 years and the project is expected to last 25-30 years. The aim of the project is to Finance Build Own and Operate (FBOO) a 300 MW wind farm beside Lake Turkana. The wind farm will have 353 wind turbines each with a capacity […]